The Proposed Shoreline Trail
Restoring Access to the Hudson River and Creating a Safe Path Connecting Area Trails
The proposed Shoreline Trail section of the Fjord Trail would connect Dockside Park in Cold Spring to Little Stony Point and Breakneck Ridge. Planning for the Shoreline Trail is currently in the concept design phase, meaning initial design ideas are being explored and community stakeholder feedback is being collected. This two-mile section within the River’s Edge zone of the project is being designed to create visual and physical connections to the Hudson river and provide a safe and ADA-compliant walking and biking route as an alternative to Route 9D. Designs for the Shoreline Trail prioritize creating resiliency in what is a currently highly disturbed environment. Read on to learn more...

Shoreline Trail Sections
Shoreline Trail North
Connecting Breakneck Ridge and Little Stony Point
This portion of the trail would enable hikers to travel from Little Stony Point/Washburn Trailhead parking lot to Breakneck Ridge, without having to walk on busy and dangerous Route 9D. Solving this current major pedestrian and motorist safety hazard is the main impetus for envisioning Shoreline Trail North. In connecting to Breakneck Bridge and thereby Breakneck Metro-North station, this section would also provide those who arrive at the station a route south along the river.
A combination of on-grade and on-structure trail in this section would incorporate trail banks for moments of rest and opportunities to be close to the water, a kayak pull-up location, and planted SAV shelves.
Shoreline Trail South
Connecting Little Stony Point and Dockside Park
As proposed, Shoreline Trail South would provide an alternative route to the trails for trail-bound visitors who currently use Fair Street and Route 9D to get from the Cold Spring train station to trails near Little Stony Point and points north. In addition to moving this foot traffic out of the Village of Cold Spring, Shoreline Trail South would also provide river access in an area that is currently restricted by the rail line.
The trail would be on-structure in most of this section, tracing the existing rail causeway, with trail banks for viewing and seating.
Learn About the Shoreline Trail Concept Design from Experts
Shoreline Trail Concept Design Intro with Kate Orff, SCAPE
Shoreline Trail Constructability with Matt Carter, Arup
Shoreline Trail Presentation by Gena Wirth, SCAPE
Shoreline Trail Concept Design Intro with Kate Orff, SCAPE
Shoreline Trail Constructability with Matt Carter, Arup
Shoreline Trail Presentation by Gena Wirth, SCAPE
Key Elements of the Design
Habitat Restoration and Shoreline Resiliency
The river's shoreline in the area between Dockside Park and Breakneck has been heavily impacted by industry and the railroad, and is not a natural shoreline in most places. Rather, it is man-made and consists largely of fill. As the design for Shoreline Trail develops, the team is exploring how we can restore or create habitat in this area, and contribute to shoreline resiliency. This will include:
- Invasive species remediation
- Repairing erosion at the water’s edge
- Stabilizing the railroad tracks from tidal erosion and the effects of river rise
- Restoring habitat for native flora and fauna
- Adding planted shelves for submerged aquatic vegetation
Re-establishing River Access
When the railroad was installed more than 100 years ago, it fragmented the shoreline and cut off access to the river. The Shoreline section of trail would restore river access, including for those using wheelchairs and other mobility aides.
Minimizing In-Water Impacts
With resiliency to river rise as a crucial focus of the Shoreline Trail design, the team worked hard to minimize both the amount of trail that will be on structure and the number of piles making contact with the river. Nearly 50% of Shoreline Trail is designed to be an on-grade gravel path, similar to a carriage path. Only 5% of piles are likely to be in the water at low tide. In the section between Little Stony Point and Dockside Park, the structure is designed for small-scale, top-down construction and will not require barges.
Accessibility
The Shoreline Trail and the entire Fjord Trail main trail are being designed to AGODA and ADA standards, ensuring safe recreation for a broad spectrum of trail users including those using wheelchairs and those wheeling strollers. The trail will include intentional moments of rest, approximately every quarter mile. These vary based on the site, but include seating and visual or physical access to the river.
Improving Resident Quality of Life
Many trail-bound visitors currently arrive by train to the Village of Cold Spring, and walk along Fair Street to reach Little Stony Point and points north. By creating a more direct route out of the Village of Cold via the Shoreline Trail and quickly diverting trail-bound visitors, the Fjord Trail would relieve some of the burden currently felt by Village residents. The Shoreline Trail would also create an additional location to disperse Seastreak visitors. Residents share that many Seastreak passengers linger and create congestion around lower Main Street after they've finished dining and shopping but before it's time to re-board the boat. Apart from easing the congestion felt in the Village, the Shoreline Trail would improve residents' quality of life as a community recreational resource for residents to use seven days a week, as a trail in and of itself, and as a way to connect to other trails in the Highlands.
New Potential Alternative Route to Connect Shoreline Trail to Cold Spring MNR Station: Alignment #6
As a result of public input, an additional alternative route (shown as a yellow-dotted line below) from the Cold Spring Metro-North train platform to the Shoreline portion of trail is being considered. The route would run along the west side of the Metro-North Railroad (MNR) tracks in the Village of Cold Spring, directly connecting the Cold Spring MNR station platform to the northeast side of Dockside Park, thereby eliminating the need for any pedestrian traffic through the lower Village neighborhood west of the tracks. HHFT is currently exploring whether this new route is a viable option, as it would require a reduction in MNR's current setback requirement.


Shoreline Trail Design Team
SCAPE Landscape Architecture shares HHFT’s ecology-forward aesthetic and has the expertise in resilient design needed to create a riverside park that endures.
Arup is a collective of designers, engineering and sustainability experts, and advisors dedicated to sustainable development. Using imagination, technology, and rigor, they create projects like the one that will take Fjord Trail visitors over the Metro-North Railroad tracks at Breakneck Ridge.

SLR Consulting is a global leader in environmental and sustainability solutions with experts operating across more than 30 technical disciplines, who partner with clients to tackle some of the world’s most complex sustainability challenges.
The Shoreline Trail and larger Fjord Trail project are currently undergoing a rigorous environmental review process under the State Environmental Quality Review Act (SEQRA). Visit our SEQRA process page to learn more, and stay tuned for updates on the public comment period for the project.
Base Map for Phasing Plan: SCAPE Landscape Architecture
Concept renderings: Darcstudio
Breakneck photography: Christine Ashburn
Nimham photography: Chris Vultaggio